http://mircwiki.rsna.org/api.php?action=feedcontributions&user=Scaffolding&feedformat=atomMircWiki - User contributions [en]2024-03-28T08:29:31ZUser contributionsMediaWiki 1.35.5http://mircwiki.rsna.org/index.php?title=User_talk:Scaffolding&diff=5077User talk:Scaffolding2011-01-14T09:21:46Z<p>Scaffolding: </p>
<hr />
<div><h1>[http://www.iscaffold.com.cn scaffolding]</h1><br />
<br />
scaffolding engineering calculation rules <br />
<br />
First, building comprehensive <b>[http://www.iscaffold.com.cn scaffolding]</b> outside the building floor by floor area calculated above. Building height refers to the design of the outdoor terrace to the eaves height. Scaffolding their basement floor area calculation. <br />
<br />
Second, full house cast reinforced concrete foundation strip width is greater than 3.0m of the base, can be calculated by full house foundation area based scaffolding, without deduction of the wall area occupied, or an additional transport channel based outside the area. <br />
<br />
Third, the vertical protective frames, the natural floor to the top layer between bar height multiplied by the actual erection erection length, area calculation. <br />
<br />
Fourth, in the scaffolding by the vertical projection area of the wall. <br />
<br />
Fifth, other structures of the scaffolding: <br />
<br />
Sixth, building by building vertical closed network perimeter length multiplied by the design of outdoor floor to eaves height to floor area. Parapet or cornice height of more than 1.2m, and its height can be considered closed network to the top of the parapet wall or cornice. Add a bamboo vertical closed network scaffold board, high increase of less than 30m bamboo scaffold board 0.30 m2, 20m higher wire 0.07kg each other to increase the bamboo scaffold board 0.009 m2, wire 0.002kg, man 0.006 man-days, other machinery costs 0.01 yuan. <br />
<br />
Seven additional layer of old buildings in floor construction scaffolding costs include comprehensive scaffolding, the external walls of old buildings double scaffolding. Plus a comprehensive scaffolding story building floor area by adding layer after layer applied to the corresponding canopy plus a comprehensive scaffolding of a fixed high. External walls of old buildings double scaffolding, no matter whether the outer wall of the old buildings the new decoration, according to the length of the old buildings outside the old building eaves height multiplied by the vertical projection area, high canopy cover according to the corresponding fixed by double scaffolding Calculation of a factor of 0.5. <br />
<br />
Jan. 14 more knowledge of scaffolding and <b>[http://www.iscaffold.com.cn aluminum beam]</b> description, please visit this site and the <b>[http://www.iscaffold.com.cn/bbs scaffolding bbs]</b> to the website: http://www.iscaffold.com.cn 24 hour customer service phone!<br />
<br />
<br />
http://www.iscaffold.com.cn<br />
http://www.iscaffold.com.cn/news_sitemap1.html<br />
http://www.iscaffold.com.cn/pro_sitemap1.html<br />
http://www.iscaffold.com.cn/news_sitemap1.html<br />
http://www.christian-louboutinsale.net<br />
http://www.weipuconnector.com/productcatalognew.htm<br />
http://www.weipuconnector.com/waterproof-connectors.html<br />
<br />
<h1>[http://www.iscaffold.com.cn scaffolding]</h1><br />
<br />
Features highlights of fastener known scaffolding <br />
<br />
<b>[http://www.iscaffold.com.cn scaffolding]</b> fastening features highlights: <br />
<br />
1, scaffolding fasteners and easy maintenance: the product itself is not easy due to rust, not damaged, after the maintenance is very convenient to use not only reduces the difficulty of maintenance also saves the cost of maintenance. <br />
<br />
2, scaffolding and strong corrosion resistant fasteners: galvanized the whole double by passivation and anti-corrosion treatment, increase the capacity of its anti-corrosion, long life, far more than the life of cast iron fasteners. <br />
<br />
3, scaffolding fasteners and strong resistance to removal: using the new connection, the new nut to ensure that there is distortion in the case of steel, fasteners can always firmly fixed vertically, eliminating the possibility of pipe slippage. <br />
<br />
4, scaffolding fasteners fast lightweight, structural optimization: Fasteners light, beautiful, comfortable, fast loading, reduce labor intensity, the work efficiency. <br />
<br />
5, scaffolding fasteners, making advanced technology: the use of cold technology, low energy consumption in the production process, pollution-free, fully in line with the national energy conservation policy. The iron fasteners backward production technology, a high-energy high-pollution technology, process safety performance in the use of non-compliance, has been included in the national phase-out of restricted products. <br />
<br />
6, scaffolding fasteners, fastener can use the guitar to raise the overall construction of brand image, increase the use of side bidding competitiveness. Does not increase the cost of using the side, do not spend money you can spend a safe, comfortable, convenient good fastener. <br />
<br />
7, scaffolding fasteners has security advantages, the quality advantage, brand advantage, in the fastener rental worry, effort, lease rental income than poor iron fasteners. <br />
<br />
8, scaffolding slide fastener strong performance: to ensure that the pipe was fit with fasteners, surface state, posted a large area, to overcome the iron and steel fastener point or line showed the shortcomings of fit, eliminating slippage of the hidden pipe. <br />
<br />
9, scaffolding strong resistance to deformation fasteners: steel stamping and fastener than normal, due to the different production process, breaking the traditional stamping process limitations on the material thickness up to 5 mm, is fully capable of ensuring the process does not use deformation, thus ensuring the product safe and effective use of repetition. <br />
<br />
14, scaffolding fasteners excellent fracture resistance: Structure of advanced, cold forming steel plate, strength and toughness than current national standards, the total elimination of the iron fastenings scaffolding collapsed due to break led to accidents. <br />
<br />
Jan. 14 more knowledge of scaffolding and <b>[http://www.iscaffold.com.cn aluminum beam]</b> description, please visit this site and the <b>[http://www.iscaffold.com.cn/bbs scaffolding bbs]</b> to the website: http://www.iscaffold.com.cn 24 hour customer service phone!</div>Scaffoldinghttp://mircwiki.rsna.org/index.php?title=User_talk:Scaffolding&diff=5076User talk:Scaffolding2011-01-14T09:19:19Z<p>Scaffolding: New page: <h1>[http://www.iscaffold.com.cn scaffolding]</h1> scaffolding engineering calculation rules First, building comprehensive <b>[http://www.iscaffold.com.cn scaffolding]</b> outside the b...</p>
<hr />
<div><h1>[http://www.iscaffold.com.cn scaffolding]</h1><br />
<br />
scaffolding engineering calculation rules <br />
<br />
First, building comprehensive <b>[http://www.iscaffold.com.cn scaffolding]</b> outside the building floor by floor area calculated above. Building height refers to the design of the outdoor terrace to the eaves height. Scaffolding their basement floor area calculation. <br />
<br />
Second, full house cast reinforced concrete foundation strip width is greater than 3.0m of the base, can be calculated by full house foundation area based scaffolding, without deduction of the wall area occupied, or an additional transport channel based outside the area. <br />
<br />
Third, the vertical protective frames, the natural floor to the top layer between bar height multiplied by the actual erection erection length, area calculation. <br />
<br />
Fourth, in the scaffolding by the vertical projection area of the wall. <br />
<br />
Fifth, other structures of the scaffolding: <br />
<br />
Sixth, building by building vertical closed network perimeter length multiplied by the design of outdoor floor to eaves height to floor area. Parapet or cornice height of more than 1.2m, and its height can be considered closed network to the top of the parapet wall or cornice. Add a bamboo vertical closed network scaffold board, high increase of less than 30m bamboo scaffold board 0.30 m2, 20m higher wire 0.07kg each other to increase the bamboo scaffold board 0.009 m2, wire 0.002kg, man 0.006 man-days, other machinery costs 0.01 yuan. <br />
<br />
Seven additional layer of old buildings in floor construction scaffolding costs include comprehensive scaffolding, the external walls of old buildings double scaffolding. Plus a comprehensive scaffolding story building floor area by adding layer after layer applied to the corresponding canopy plus a comprehensive scaffolding of a fixed high. External walls of old buildings double scaffolding, no matter whether the outer wall of the old buildings the new decoration, according to the length of the old buildings outside the old building eaves height multiplied by the vertical projection area, high canopy cover according to the corresponding fixed by double scaffolding Calculation of a factor of 0.5. <br />
<br />
Jan. 14 more knowledge of scaffolding and <b>[http://www.iscaffold.com.cn aluminum beam]</b> description, please visit this site and the <b>[http://www.iscaffold.com.cn/bbs scaffolding bbs]</b> to the website: http://www.iscaffold.com.cn 24 hour customer service phone!<br />
<br />
<br />
http://www.iscaffold.com.cn<br />
http://www.iscaffold.com.cn/news_sitemap1.html<br />
http://www.iscaffold.com.cn/pro_sitemap1.html<br />
http://www.iscaffold.com.cn/news_sitemap1.html<br />
http://www.christian-louboutinsale.net<br />
http://www.weipuconnector.com/productcatalognew.htm<br />
http://www.weipuconnector.com/waterproof-connectors.html</div>Scaffoldinghttp://mircwiki.rsna.org/index.php?title=Talk:Underwear&diff=5075Talk:Underwear2011-01-14T09:13:23Z<p>Scaffolding: New page: <h1>[http://www.iscaffold.com.cn scaffolding]</h1> scaffolding firm protection measures: a wall or pole Around buildings along the first extension of the construction should be the last...</p>
<hr />
<div><h1>[http://www.iscaffold.com.cn scaffolding]</h1><br />
<br />
scaffolding firm protection measures: a wall or pole <br />
<br />
Around buildings along the first extension of the construction should be the last coincidence in the first elevation. Pole erected, there should be temporary or bracing Rachel protection, not a separate operation, causing <b>[http://www.iscaffold.com.cn scaffolding]</b> collapsed wounding. <br />
<br />
The first step is completed, should also complete the joists laid. Joists in the inside and outside the large bar placed equidistant from the middle two, and the small bar firmly. At the same time laying the bamboo fence. Bamboo fence should be sufficient overlap, and were single with 18 # wire tied in a large double loop on the bar. <br />
<br />
After completion of the second high scaffolding to carry out even the wall bar connections. Connection should be carefully corrected until after the fixed vertical pole. Step 2 from Step Up, about three-span, set the pull contacts. <br />
<br />
After carrying out a wall or pole connectors, while the outside pole and oblique rod fixed, removal of temporary pole pieces and oblique Rachel. After the slash, and even with the scaffolding construction of the wall rod incremental synchronization. <br />
<br />
Scaffolding in order to ensure uniform forces per pole, pole and small bar should be symmetric setting. <br />
<br />
After two-step height, according to a high place provides protection should be located inside the railings outside the pole and stop foot lever measures. Optional 4500mm pole specifications protective railings, steps away from the surface of 1400mm height, with a right-angle fastener fastening, lashing wire is not allowed <br />
<br />
then at work, including scaffolding diagonals then take a long length and pole, with two operations must not allow a separate operation, or easily cause accidents. <br />
<br />
Jan. 14 more knowledge of scaffolding and <b>[http://www.iscaffold.com.cn aluminum beam]</b> description, please visit this site and the <b>[http://www.iscaffold.com.cn/bbs scaffolding bbs]</b> to the website: http://www.iscaffold.com.cn 24 hour customer service phone!</div>Scaffoldinghttp://mircwiki.rsna.org/index.php?title=User:Scaffolding&diff=5073User:Scaffolding2011-01-11T09:02:12Z<p>Scaffolding: New page: <h1>[http://www.iscaffold.com.cn scaffolding]</h1> Other structures of the scaffolding calculation rules 1. Brick structures above or below the design height of 1.2m above the floor, <b...</p>
<hr />
<div><h1>[http://www.iscaffold.com.cn scaffolding]</h1><br />
<br />
Other structures of the scaffolding calculation rules <br />
<br />
1. Brick structures above or below the design height of 1.2m above the floor, <b>[http://www.iscaffold.com.cn scaffolding]</b> the erection by the length multiplied by the height of structures calculated quantities of area, height of 3.6m or less, apply in scaffolding fixed; height of 3.6m above , apply a single row of scaffolding fixed. <br />
<br />
2. Stone structures above or below the design field above floor height of 1.2m, according to the length multiplied by the height of structures, erection of quantities in terms of floor area, height of 3.6m or less, apply a single row of scaffolding safety net of fixed deductions; height of more than 3.6m or more, apply double scaffolding fixed. <br />
<br />
3. Wall scaffolding, according to outdoor natural floor to the top surface of the masonry wall height of the wall multiplied by the amount of length to area calculations. Height of 3.6m or less, apply in scaffolding fixed; height of more than 3.6m above, apply the single-row fixed scaffolding. <br />
<br />
4. Outdoor pipe scaffolding, according to the length of pipe to extend the center line of quantities in meters, the outdoor sets of scaffolding pipes fixed, height from the natural floor under the skin into the pipeline operator (multi-layer arrangement of pipes, the pipes at the top layer under the skin) , <br />
<br />
5. Stone revetment vertical height of more than 1.2m, and the ramp area of quantities, sets of single row of scaffolding (net of safety nets) multiplied by the coefficient 0.2 scale. <br />
<br />
6. Brick chimney outside the scaffolding to seat basis, according to the design height of the outdoor floor surface to the top of the Shaft by the chimney height; underground part of the scaffolding has been included within the fixed and can not be calculated. <br />
<br />
7. Tower scaffolding to seat basis, height is designed outdoor floor surface to the top of the full height. Chimney with those towers, scaffolding height of the chimney height calculation by the Executive Tower scaffolding scale. Calculated only once for each water towers scaffolding costs. <br />
<br />
Jan. 10 more knowledge of scaffolding and <b>[http://www.iscaffold.com.cn aluminum beam]</b> description, please visit this site and the <b>[http://www.iscaffold.com.cn/bbs scaffolding bbs]</b> to the website: http://www.iscaffold.com.cn 24 hour customer service phone!</div>Scaffolding